Cover and prepare all work areas
- • Remove and discard existing tar & gravels, metal flashing, metal drip edge and flashings around pipes and ducts;
- •Remove and replace up to 10% of existing rotten decking with new;
- •Call for decking inspection;
- • Install new flashing around all vents and pipes;
- • Apply weatherproof mastic to prevent leaks and provide seal;
- • Apply Rustoleum to prevent rusting and match roof color;
- • Install new metal drip edge around perimeter of the roof;
- • Install new base fireproof underlayment using galvanized nails over entire roof;
